Nora Keystone Gateway: Preliminary Design #1

This summer community members met with Keep Indianapolis Beautiful, Inc. (KIB) for the Nora Alliance’s first meeting to capture public input regarding Nora’s Keystone & 86th Street Gateway.

Check out the PRELIMINARY DESIGN provided by Keep Indianapolis Beautiful, Inc and CEC, Inc. We’d like to have your input!

Items discussed at July 2015 public meeting:

 Appearance of space
 Keep canopy
 Examine range of improvements
 Improve connectivity (accommodate future improvements)
 Wildflowers
 Public Art (North Central Students?)
 Clean up trash
 Improved signage
 Neighborhood identity
 Improve lines of sight
 Incorporate INDOT trees

Preliminary design preparation thoughts:

  1. Improve manicured edge/INDOT required buffer – 20’ +/‐
  2. Accommodate future pedestrian connector

‐ Maintain a 25’ +/‐ manicured edge on north and south sides of 86th Street or approximately to top of sloped concrete wall and under power lines on south side
‐ Include area between north and southbound Keystone

  1. Identify invasive species and remove including Mulberry, Hackberry, Honeysuckle, etc.
  2. Contact INDOT to discuss influencing bridge color?
  3. Clean out invasives behind northbound exit ramp guardrail

Preliminary design initial phase (2015) thoughts:

1. See attached plan

Preliminary design future phase thoughts:

  1. Investigate topography for wet areas to create streambed landscape
  2. Incorporate limestone block “welcome to Nora” signs into landscape + accent stone – walls?
  3. Upgrade guardrails to painted – black?
  4. Upgrade signals and signal poles?
  5. Wayfinding – shopping, library, park, school, etc?…there is a N.C. sign on the northbound ramp

Given the scope, this is going to be a longer term project with the hope of having some initial quick wins as the construction wraps up.

Project background:

The Keystone Avenue Bridge at 86th Street, currently under construction, serves as a gateway to the Nora community. However, the bridge, exit ramps, and surrounding land have been neglected for years, collecting trash, invasive plants, and the occasional homeless person camping out in the overgrown wooded areas. With the current construction of the Keystone Bridge, we have an opportunity to give this area a facelift. Read the post “Nora’s 86th St / Keystone Bridge Gateway Beautification Project” for more about the project’s background.

Nora Alliance July 2015 meeting with Keep Indianapolis Beautiful

Nora Keystone Gateway: 1st Meeting with Keep Indianapolis Beautiful

On July 20th, community members met with Keep Indianapolis Beautiful, Inc. (KIB) for the Nora Alliance’s first meeting regarding Nora’s Keystone & 86th Street Gateway. This is a summary of that meeting, and invitation for continued public input.

The Keystone Avenue Bridge at 86th Street, currently under construction, serves as a gateway to the Nora community. However, the bridge, exit ramps, and surrounding land have been neglected for years, collecting trash, invasive plants, and the occasional homeless person camping out in the overgrown wooded areas. With the current construction of the Keystone Bridge, we have an opportunity to give this area a facelift. Read the post “Nora’s 86th St / Keystone Bridge Gateway Beautification Project” for more about the project’s background.

KIB’s Mark Adler, Janet Baker, and planner David Roth led the group in a review of the Keystone Bridge construction and opportunities for a beautification project. Mark Adler presented information on the current conditions of the interchange and construction (scheduled for completion in the late fall 2015), followed by an open discussion. Here’s what we heard:

Opportunities
  • current construction remediation requires tree replacement, but without maintenance plans — this is an opportunity to segue with a beautification project and community-driven design
  • community desire to preserve existing tree canopy for noise reduction and wildlife
  • public art – look at concepts and location within the interchange
  • create vegetated edge plantings
  • reduce or eliminate mowings with native platings wildflowers and tall grasses
  • improved signage for the interchange
  • plan / public art that embraces the strengths and weaknesses of the interchange (e.g., power line structures, the community history)
Concerns
  • homelessness, pan handlers and drug use are past and/or current issue
  • open up line of sight at ramp exits / lights
  • honeysuckle in the area (invasive species)
  • traffic noise affecting nearby residential
  • soil may be compressed in construction staging areas
  • don’t create any plans that preclude a future sidewalk / bike path under Keystone Bridge
  • need more community input on gateway concept – gateway to where? Nora community / neighborhoods (west)? Keystone businesses (east)?
Next Steps

KIB, with planner David Roth, will take the feedback they’ve gathered during this first meeting and put together some preliminary plans for the interchange. Within the next few weeks, the Nora Alliance will schedule a second public meeting to present and provide further input to the plans. With plans in hand, KIB will work with the community to identify funding for the project implementation and maintenance.

We welcome continued feedback during this process! If you would like to provide additional input while the plans are being developed, please contact Mark Adler, KIB Director of Special Projects.

 

 

 

Nora’s 86th St / Keystone Bridge Gateway Beautification Project

What would a nice gateway to Nora look like? With your help, we will work with Keep Indianapolis Beautiful to answer that question.

The Keystone Avenue Bridge at 86th Street, currently under construction, serves as a gateway to the Nora community. However, the bridge, exit ramps, and surrounding land have been neglected for years, collecting trash, invasive plants, and the occasional homeless person camping out in the overgrown wooded areas. With the construction of the Keystone Bridge, we have an opportunity to give this area a facelift.

Project Background
Keep Indianapolis Beautiful was contacted a few times in the past year or two by neighbors in the Nora community asking if they could do anything to help with beautifying the ugly Keystone Bridge at 86th Street interchange. They were exploring the idea, then the bridge construction came up offering some opportunity to get engaged. The Nora Alliance will organize two community meetings in mid-July and August to help Keep Indianapolis Beautiful gather input on design plans for the interchange, with the following objectives:
  • to engage the Nora community in proactive planning with the assistance of Keep Indianapolis Beautiful
  • to help address the homeless population that are living in this area from time to time
  • to meet the community wants and needs with a design based on community input
  • to determine what gets put in place in areas that have already been cleared by the construction process
  • to determine how to maintain wildlife / greenspace as desired by the community
  • to determine a tree maintenance plan so newly planted trees are maintained and thrive after construction crew is gone (these do not otherwise have a maintenance plan, and trees often die after the construction phase)
  • to work with Keep Indianapolis Beautiful to help in the planning and design phase, and then in seeking funding to implement the plan

The goal for the July meeting is for a designer to capture what is important to the community at this space so a design can be created. The goal for the August meeting is for the designer to come back with a rough drawing capturing feedback from July and gather final feedback before getting a solid plan to go forth with.

Dates and times for the meetings are still being determined. Feel free to contact us with any questions or concerns about the project. Stay tuned for more information!